Ple4Win

Phased calculations

Phased calculations allow the initialisation of the pipe/soil structure by means of import of pipeline displacements and soil reactions from another design database containing the results of a previous (construction) phase. Changes to the model, such as adding or removing connections or changing soil values are possible between phases. This allows convenient modelling of complex situations such as pre-tensioning steel-in-steel sections.